Several months ago, we have installed the elevator’s main shaft construction (see article) . Followed by this, we have launched the project’s remaining steel frames into production, which are now being finalized and tested short before these are shipped overseas.
This innovative drive system has never been seen before and is fully compliant with functional codes and regulations.
Upon completion of all system tests (full scale, full weight), the frames will be disassembled and shipped over to the impressive project site. After which, all the parts will be installed efficiently – following the plans developed in collaboration with the contractor on site.
Afterwards, we will supply the remaining glass and the cladding materials; and implement the smaller mechanical items. Altogether, the project will be finished and commissioned in Q2 of 2023.
Looking forward to see the finalised project? Follow us on LinkedIn for future updates and insights into our current and future projects.

More XEL News


XEL contracted for penthouse-type elevator in luxurious Monaco apartment
For a unique renovation project in the Mediterranean area, XEL was contracted for the development of a penthouse-type elevator.


Case: XEL designs antique elevator for monumental canal house in Amsterdam
XEL has been asked to design an antique style elevator in a monumental mansion on the famous canals of Amsterdam (a so called Grachtenpand).


XEL develops Antique Elevator for a Belgian Castle
XEL has been contracted for the creation and implementation of an antique elevator for a Belgian castle. Tasked with creating and fitting a truly authentic antique elevator, while meeting the newest safety regulations, we have done the following.